Scope of work
Workshop documentation of the steel structure with conection calculations:

  • Turbine House (5 000 tons)
  • Air preheater (3 000 tons)
  • Bunkerhouse (1 000 tons)
  • Pipe racks (900 tons) – with full static calculations

Executive design of the foundations of Executive design of the foundations and reinforced concrete structures:

  • Pipe racks
  • Pumping Station
  • Lime Stone FGD and Waste Water Treatment Plant

Location
Bogatynia, Poland